JOHNSONVILLE RAIL LINE UNDERCUT

Nov 9, 2017

The winter rains brought havoc to the Wellington region. One slip threatened to undermine the Johnsonville rail between tunnel 4 and 5. Abseil Access set to work, alongside Aurecon, to fix it up urgently. 77 GRP anchors up to 8m deep and wire rope re-inforced MacmatR were installed within 3 months. Job done.