STACKED UP AT TIWAI POINT
We have a lot of jokes to tell and some of them are about chimneys, but this one is on the house.
One of our teams is towards the end of a conduit install at NZAS to enable a link to monitoring equipment on the side of the wind shell.
The project scope suited the strengths of rope access; a complete system, in which planning, risk management, competence and suitable equipment is treated with equal importance, as each is dependent on the other to ensure a safe system of work.
Our services allow for access, labour, rescue, environmental controls, and set-up/take-down in one complete system, for one total cost.